Icons for a maintenance work order
Answer in brief
Separate the asset, service task and work status. A wrench can locate maintenance requests, while a pump ID and location tell the technician which installed unit needs attention.
Make the asset identifier primary
Two identical pumps can serve different lines in the same room. Put the asset tag and location next to the illustration. Include the work order number separately so a call about the job can identify the request as well as the equipment.
Check a parts delay
Mark inspection complete but repair pending a replacement part. The work order should retain the technician's findings and name the remaining work. A single “Done” state would lose the equipment's service history.
Retain evidence when a technician changes
On reassignment, show the outgoing technician’s last observation and the time the new owner accepted the job. Keep their photos attributed to their authors so a later worker can ask the right person about an unexpected condition.
Frequently asked questions
Where should an attachment icon appear?
Place it beside the specific manual, photo or service report. A count on the order header is less helpful when a technician needs the installation diagram.