Designing icons for a construction punch list

By SkeuDesign Editorial Team1 min read

Answer in brief

Use floor and room identifiers to anchor each deficiency and a trade symbol to route it. Keep a photograph of the issue attached to its exact list item.

Locate repeated defects independently

Two chipped tiles in adjacent bathrooms can have identical descriptions. Give each item a room code and plan marker. Selecting a marker should open the matching photograph and assigned trade.

Review a reopened item

Mark a repair complete, then reject it during inspection. Preserve the repair photo and inspector comment with their dates. Distinguish contractor completion from verified acceptance in the list.

Carry plan revision through the handoff

When a floor plan is revised, keep each issue linked to the drawing revision on which it was pinned. If positions move, flag the item for placement review and retain the original room reference for the site team.

Frequently asked questions

Should the marker show the trade or severity?

Choose the attribute relevant to the current plan view and label the legend. Put both values in the item detail where they can be read together.