Icons for a project dependency view

By SkeuDesign Editorial Team1 min read

Answer in brief

Use lines to connect work items and label dependency direction. A task that blocks three others needs different attention from one waiting on three prerequisites.

Name both ends of the relation

For “Proofread brochure” and “Send to printer,” display “Send to printer waits for Proofread brochure” in the inspector. This sentence checks the meaning of the connector even when a graph layout flips left to right.

Complete one prerequisite while the other stays open. Keep the downstream task visibly waiting and name the remaining prerequisite. A check on a single connector should never imply every dependency cleared.

Explain a deleted prerequisite

If a linked task is archived, retain its name in the relationship history and describe whether the dependency still applies. An unlabeled dangling connector can make the downstream task look either blocked forever or ready by mistake.

Frequently asked questions

Can the same arrow indicate navigation?

Use separate affordances for opening a task and showing a relation. The connector can be inspected while the task title opens its details.